[Image taken 21.05.23] Malton Road, Huntington / York. Note the new sign. It says there is access to New Lane. That’s good. It’s true. This means pedestrians can continue to the path along this side of New Lane (and from there to the … [more]
[Image taken 17.5.23] Tadcaster Road, York. The road works-related signage means this Sheffield (outside a parade of shops and a takeaway) cannot be used. Is this a problem of lack of care? Lack of understanding? Lack of training? Someone … [more]
[Image taken 14.5.23] New Lane direction of Malton Road, Huntington / York. The information sign does not provide a phone number to report problems on. Such as fallen barriers: #193945. Or complaints: that the shared use path is … [more]
[Image taken 26.6.22] Manor Lane, junction with Manor Park Road, York. A fallen temporary works sign is a hazard - barely visible, And the cone couldn't be seen until you got this close. (I moved both off the road/avoiding the pavement.) … [more]
[Image taken 14.4.22] Mill Lane, York. The explanation for the works is on that sign. But there is no information board for the works so there's no information about who to contact or how to do so to report issues. Other images today this … [more]
UPDATE: 14.5.22 I saw the route was open again. All signage has been removed. [UPDATE On 19.4.22 CYC said: "We have asked for the cyclists dismount sign at the northern end of Mill Lane to be removed." See: #181987] [Additional images taken … [more]
[Image taken 4.4.22] Aldwark, junction with St Saviour's Place, York. These are the companion signs to: #181274. Were these signs here on 1.4.22? Were they hidden by the vehicle exiting Aldwark? Or by one parked here? (See: #181605.) I also … [more]
[Image taken 13.3.22] Bootham, York. Context and links: #180045. A cone in the pavement adds to the mess, confusion and hazards. As I was taking this image a steady stream of pedestrians moved through the works in both directions: at one … [more]
[Update: The layout of the works continues to change. Newer image: #180467.] Image taken 13.3.22] Bootham, York. After a windy weekend the barriers (presumably a health and safety requirement) are horizontal on the road and on the pavement. … [more]
The west end of the Strand was closed to through motor traffic in August 2021. It's STILL a building site in March 2022, with no through access for bikes at the west end.
The west end of the Strand was closed to through motor traffic in August 2021. It's STILL a building site in March 2022, with no through access for bikes at the west end.
[Image taken 8.3.22] Bootham, York. No provision for people on cycles during the works. The non-compliant advisory cycle lane is reduced in width by the cone and the works sign. Other image here today: #179817 and links.
Mill Road, Cambridge this morning. A quartet of signs on an already narrow and often busy footway. Just enough space for the wheelchair user to pass, but luckily a workman was nearby at the fifth. More signs beyond. Three weeks of this to … [more]
The west end of the Strand was closed to through motor traffic in August. It's still a building site.
The west end of the Strand was closed to through motor traffic in August. It's still a building site.
The crossing to the east of Bunhouse Road has now been provided with asphalt ramps to aid pedestrians crossing. No sign of either dropped kerbs or raised crossings being installed. Incorrect corduroy (hazard) tactile paving is still in … [more]
Still finishing work to be done on the rebuilt Bunhouse Road shared footway, and still no indication of priorities at the car park entrance.
[Image taken 20.7.21] Station Avenue, York. The vehicle here is obstructing sight of temporary crossing lights for people on cycles needing to reach this lane. Other images here today: #172327, #172328, #172330. Other images today: #172321 … [more]
@camcycle Tenison Road now. The message about that signage still not getting through to contractors https://t.co/x2ok5nDNJX
Update 1.7.21. Signs and work area had gone. [Image taken 29.6.21] Bootham Terrace, York. Fallen cone. Deconstructed sign. One is not doing its job and is therefore clutter. One is a hazard. Other images this issue, this location today see: … [more]
NO ! Cyclists cannot be expected to dismount just because they're slower through the lights than cars.
Maybe it's because I don't enter Speirs Wharf from Craighall Road very often, but I almost cycled down the cobbled slope since I was this time going to turn left down the ramp to Garscube Road. The layout here could be better. The steps … [more]
The cycle track alongside Fountainwell Road ends here, with some Guidance Path tactile paving. It looks suspiciously like it will go no further on this side, and it crosses over to a new path on the other side of what can be quite a busy … [more]
[Image taken 18.4.21] Clifton Moor Gate, York. Clifton/Rawcliffe are leisure, residential and retail areas with a network of segregated pedestrian and cycling links. York Council signs consistently overlook the existence of people who cycle … [more]
Slow progress on the Old Dumbarton Road cycle track. The corduroy tacile paving is incorrect. UPDATE: The raised crossing has been installed, but the tactile paving remains incorrect. See #175266.
18.4.21: Updated images/captions: #167349. [Image taken 1.4.21] Clifton Moor Gate, York. The gap left for pedestrians is very narrow. There's no room to pass - even at pre-social distancing space requirements. It was tight on laden cycles. … [more]
18.4.21: Updated images/captions: #167349. [Image taken 1.4.21] Clifton Moor Gate, York. Works are taking place where there is usually a toucan crossing. No provision at all has been provided for people who cycle. Yet this … [more]
North Canal Bank Street is being extensively rebuilt, and includes a segregated cycleway. However, incorrect corduroy (hazard) tactile paving has been used instead of the cycleway type.
North Canal Bank Street is being extensively rebuilt, and includes a segregated cycleway. However, incorrect corduroy (hazard) tactile paving has been used instead of the cycleway type.
Trees have been cleared to build steps from Orchard Park to the A14 interchange at last - but no ramp, as far as I can see.
Some mistake surely? Northbound cycle lane, northbound general traffic lane, no southbound cycle lane.
Some mistake surely? Northbound cycle lane, northbound general traffic lane, no southbound cycle lane.
You might think that this was a post-Covid19 pop-up cycle lane, but no, this is Cambridge, it's just for some inactive work on the footway outside Aldi.
Manchester Chester Road This road had major works done recently and had lane closures but the world did not end ! Email to saferstreets@manchester.gov.uk safestreetstrafford.commonplace.is/comments/5edc80126286f92848939dd1/ A temporary … [more]
Great to hear that the Highways Agency has toiled heroically through the lockdown to open the new A14 and remove all temporary speed limits! Will they actually finish the cycle bridges and shared-use routes soon?
I didn't venture further than this excavation to see how little stands in the way of connecting Carmunnock Road to Stewartfield Way and the East Kilbride path network.
Boquhanran Road shut for roadworks at the canal bridge, but no-one seems to have seen the memo about signing the cycle access still being open.
Me: hooray I can take a bus to work and not worry about road layouts or roadworks. Also me: I must photograph and tweet this it’s awful. (Dartmouth Rd by Sydenham School). https://t.co/7LlzKp4eOg
As usual in this car-obsessed society, Road Closed means closed to motor vehicles - cyclists and pedestrians can get past this burst water main without much problem.
As usual in this car-obsessed society, Road Closed means closed to motor vehicles - cyclists and pedestrians can get past this burst water main without much problem.
I'm not sure what the barriers here are meant to achieve, or why they are blocking the flagship cycleway on Waterloo Street.
@magnatom @GlasgowCC @AnnaLangside @GoBikeGlasgow We took this photo & plan to write to council. Why not 'please take care through roadworks and show respect to workers & fellow road users'? Feel free to use photo if you like. … [more]
Aaaand once again @GlasgowCC have allowed the shared path from Pollokshaws to Silverburn beside Barrhead Road to be blocked by works. @PersimmonHomes do you realise this route is for cyclists too and that many bikes are a lot wider than … [more]
Toucan Crossing under construction across A4130 near Backhill Tunnel Location: , Milton (England, United Kingdom)
Welcome to the Brunel Mile. The way @BristolCouncil treats pedestrians and cyclists is beyond contempt. @mthrel you should be ashamed. https://t.co/ma8ymVoMBn
A new shared footway on Archerhill Road, leading to the BMX Centre at Knightswood Park. I figure this probably isn't finished, but all the surface work appears to be done and only the lining remains to be finished. However, what alignment … [more]
Roadworks affecting the signed link between NCN 7 and Partick station, but not clear if the route is open or closed, no diversion, obstructions on the toucan crossing. A poor show all round!
Nine months after opening the new Forth Motorists' Bridge, are there any plans to introduce a functional cycle route over the Forth? @scotgov @HumzaYousaf @forthroadbridge @SpokesLothian @POPScotland https://t.co/pEbKXj6kVq
The new zebra and cycle parallel crossing on Govan Road has still not been completed! Note the parking layby is narrower than the vehicle parked in it.
The new zebra and cycle parallel crossing on Govan Road still hasn't been completed. Not even the shared footway surface has been finished!
Hampshire County Council improving the carriageway by removing the cycle lanes on the approach to B3400 West Ham Roundabout. This will allow twice as many cars to queue for the roundabout. Location: , Basingstoke (England, United … [more]
Bus lane cameras. Will there be cycle lane cameras? A stepped two-way cycle track is being built along part of Govan Road, but the footway has been reduced to a minimal width, resulting in people walking on the cycle track. An extra metre … [more]
... it's just a shame that the Bridge to Nowhere is once again living up to its name. #GlasgowCycleInfraDay17 #GetOffAndWalk https://t.co/3XpPXrlJGy
Road works to build bad new scheme for Addenbrooke's roundabout can't be bothered to provide safe crossings for people walking.
A wider view of the toucan crossing shown in #89015 that leads only to the bus stop in the distance (beside the bus). The toucan crossings do not connect anywhere where it is legal to cycle other than the carriageway. The crossings are … [more]
The replacement Bredisholm Road farm road access bridge across the A8 and M8 motorway was originally meant to be ready to reopen in July 2016, but looks like there is still quite a bit of work to do if it is to meet the revised target of … [more]
This has apparently been left like this for several weeks! No warning signs for anyone approaching from the riverside.
Tenison Road is closed for traffic-calming works - predictably, the signs are aimed exclusively at drivers and make no allowance for cyclists having access to most of it most of the time.
A newly installed painted cycle lane on Corporation Street, which has then been made narrower. More details of the cycle infrastructure along this street can be found at … [more]
The county council's contractors have left a hole in the cycle track where a lamp post has been removed - how long till it gets filled in?
The classic Romanian approach to roadworks - do it all at once (but very slowly) rather than doing half and half and allowing reasonable access.
The classic Romanian approach to roadworks - do the whole street at once, and somehow allow residents' cars in and out as well. Not a fast process.
Lots of unfinished roadworks in Sighet - quite possibly the result of a corrupt deal that went wrong - or pure incompetence.
Lots of unfinished roadworks in Sighet - quite possibly the result of a corrupt deal that went wrong - or pure incompetence.
Lots of unfinished roadworks in Sighet - quite possibly the result of a corrupt deal that went wrong - or pure incompetence.
Taking the easy option. Who makes these signs anyway? What's wrong with 'Drivers give space to cyclists' ? http://t.co/GfKiJvcQRD
Flyover under construction for access to Ottawa Train Station - but the cycle routes need improving too!
The street was closed for one day while a trench was dug to provide services for a newly built studio in the rear of a garden.
Yet another demonstration that @cardiffcouncil has no idea how a cycle lane works. @citycyclists @Cyclingnewsfeed http://t.co/RqPlXbg3y9
@carsickglasgow @bollocksinfra @GlasgowCC in the, ahem, shared use path being narrowed by barriers http://t.co/Nt8JNX7K5l
@magnatom @carsickglasgow using tablet. Never used surface being removed. http://t.co/WhUfBj6lag [This newspaper article relates: http://www.dailyrecord.co.uk/news/scottish-news/glasgow-city-council-spends-thousands-5626645]
Roadworks in Bouddha - no signs, no diversions, no sign of anything going on, and a hotel that can't be reached except by walking several hundred metres up a back alley.
Roadworks in Boudha - no signs, no diversions, no sign of anything going on, and a hotel that can't be reached except by walking several hundred metres up a back alley.
This is what happens when you think that pedestrianisation just means closing off one end of the street and a fancy surface without doing anything to control access or parking.